Introduction To The Paving Process Of WPC Floor
Jun 26, 2019
Leave a message
1. Preparing tools for product laying: wooden ruler, triangular ruler, saw blade, artistic knife, leather hammer, 2-meter ruler, triangular ruler, etc.
2. Place the selected striped locking floor in the open space, and then lay it on the right-angle line of 90 degrees according to the middle line or the side line. First, fix the first lock floor A side face to the lock surface.
3. The front side of A is connected with the lock of the front side of B. The front side of A is flattened by straight line and ground. Then the front edge of B is inserted into the A lock at an angle of 35 degrees. After using the prepared wooden straight size bracket, the floor of B lock is flattened by tapping the seam tightly, that is to say, the operation is completed.
4. Lock floor doors and edge seams are similar to the laying of wooden floors. Routine pressing strips are used for doors and special sticking strips are used for upper wall edge gaps.
5. After the completion of the lock floor laying, it should be buckled and connected, front and back buckled, horizontal and vertical are buckled and connected, the floor of each room is a whole, that is, there will be no gap in a long time.