Pay Attention To The Installation Of WPC Decking
May 15, 2020
Leave a message
The wood-plastic floor belongs to the composite environmental protection floor. It has excellent moisture-proof and waterproof properties. What should I pay attention to when installing the wood-plastic floor? Because the characteristics of wood-plastic flooring are unique, more care should be taken in the entire installation process to prevent negative effects on the construction period of the project. There are two key points for installing wood-plastic flooring:
1. Before installing the wood-plastic floor: Install the wood-plastic floor from a technical and professional perspective. Before starting the installation work, make sure that the wood-plastic floor is sufficiently dry, tidy, and leveled. The excellent conditions can finally ensure the actual installation. The effect can also reflect the smooth development of the installation work, and does not endanger the application in the middle and late stages; the installation of the gadgets should be prepared in advance in advance, the hand tools and carpenter's gadgets are often used, and the rubber gloves for labor protection supplies must be in advance Preparation, that is, more stainless steel plate screws, etc., the hand drill is an indispensable gadget for the installation of wood-plastic flooring; due to the greater ductility of the wood-plastic flooring itself, it is carried out between the wood flooring and the main keel When it is fixed, it is best to use a hand drill to drill holes first, and then use the screws of the stainless steel plate to fix the two between them. The key to the hole is to prevent damage to the wood-plastic floor. .
Second, the whole process of installing wood-plastic flooring: first fix the main keel in the wood-plastic flooring, and spread the main keel on the concrete floor neatly, to ensure that the order is well-proportioned, the interval between each main keel should be at least 30cm , Use the electric drill to develop the pilot hole. The diameter of the pilot hole can not be lower than the diameter of the screw. After the screw is screwed into the pilot hole, the main keel is fixed. The concrete floor is fixed with screws using stainless steel plates. , The screws must be completely screwed into the main keel of the wood-plastic floor, and there should be no exposed conditions, which will cause the unevenness of the plate of the wood-plastic floor; all the wood floors are designed and installed on the upper and lower sides. Before fixing the first wooden floor, saw off the male grooves on the two sides of the first wooden floor, and then use a hand drill to open the surface of the surface, and use stainless steel screws to fix the wood-plastic floor on the main keel; The second floor installation immediately fixes the male and female groove card fixed, and punches the surface to fix it, and the spacing between the screws is controlled by the installation staff, not tightly. Firmness is to ensure the future of the wood floor installation means that the male and female cross-slot card and then use the screws fixed on the line.
Send Inquiry

