Plastic Wood Floor Tile Construction Skills
May 06, 2019
Leave a message
For those of you who are interested in the construction techniques of plastic wood floor tiles, let's take a look. Installation clearance: 1. Floor installation clearance 1) Due to the slight thermal expansion and contraction of plastic wood, plus the consideration of cleaning, etc., the wood-plastic profiles are installed at the edges and edges; the ends must be left between Proper clearance. The clearance is also closely related to the weather temperature during construction. 2) It is best to install the profile on the keel when installing the wood-plastic floor. According to the thickness of the profile (20MM - 40MM), the distance between the keels is generally between 400MM-500MM. 3) When there is a dip between the profile installation and the keel, or if it is installed in the bath, reduce the distance of the keel by at least 10 cm. 2, railings, column installation clearance 1) When the splicing should also take into account the characteristics of the plastic wood heating and shrinking, but also let it have room for expansion and movement. 2) When installing the column and the road surface, the steel plate can be pre-buried in the concrete, and the steel plate at the bottom of the column is welded with the embedded steel plate or bolted. 3) When the total length of the railing is greater than 300 meters, consider the construction of the transitional transition column. 4) The style of the railing and the selected profile specifications are closely related to the span of the railing. Installation technology: 1. Plastic wood can be cut, sawed, drilled and opened with ordinary woodworking machinery. 2. Self-tapping screws can be used between plastic wood and plastic wood (suggested stainless steel self-tapping screws are recommended for outdoor use); self-drilling self-tapping screws should be used for plastic wood and steel plates. 3. When using self-tapping screws between plastic wood and plastic wood, the pilot hole should be used first, that is, pre-drilled. The diameter of the pre-drilled hole should be less than 3/4 of the diameter of the screw. 4. When installing the outdoor floor, use a screw between the plastic wood profile and each keel.
Send Inquiry

